Chat with us, powered by LiveChat You are the safety manager for a team that is working to complete a 10-story addition to a hospital. The framework of the addition will be steel and concrete. The floors will be formed and - Writeedu

You are the safety manager for a team that is working to complete a 10-story addition to a hospital. The framework of the addition will be steel and concrete. The floors will be formed and

 Consider the following scenario: You are the safety manager for a team that is working to complete a 10-story addition to a hospital. The framework of the addition will be steel and concrete. The floors will be formed and poured with reinforced concrete on metal decking. The outside will require brick and glass window installation and installation of a standing seam metal roof. The interior will consist of metal stud framing with drywall and tile floors. The building will be centrally cooled and heated with a heating, ventilation, and air condition (HVAC) mechanical system, and it will need a new electrical supply source.

The electrical rooms will be located in the southeast corner of each floor near the stairwell. Plumbing and fire suppression systems must be installed. There will be a bank of elevators in the main entrance/northside center and a service elevator in the back/southside center. There is suspected asbestos in the flooring and piping where the new addition connects to the existing structure. A new entrance must be constructed off the side street/northside, with a driveway, sidewalks, drainage, lighting, and landscaping installed.

You must complete a site-specific safety program (SSSP) for the project. You can use this  SSSP template , or you may create one of your own. 

Please view attachment 

Client:

Date Prepared:

Project:

Site Address:

– Contact Information:

Local Address:

Office Telephone:

Contact Names / Position:

Contact Telephone

Contact Mobile Tel

Updated 10/7/2013 HEALTH AND SAFETY

Page 1 of 20

SITE SPECIFIC SAFETY PLAN

Project Name and Number

Purpose:

The purpose of this method statement is to define the safe methods and procedures to be used by ——-

———— and subcontractor personnel for this noted project places the highest priority on

ensuring full compliance with all applicable safety procedures on every project. While jobsite safety is of paramount importance to on an ethical level, it is also apparent that jobs with the best

overall safety records tend to be the most profitable.

This method statement will apply to all persons associated with the works at the referenced site and to all persons who by nature of their involvement with this project interface directly or indirectly with this work.

Safety Responsibilities

· All persons will;

· All Project Management will ensure;

SITE SPECIFIC SAFETY PLAN

Project Name and Number

HEALTH AND SAFETY

Page 2 of 20

· Project Supervision shall

· Subcontractors

All Subcontractors shall:

Emergency Action Plan:

1. The emergency action plan for this project is as follows:

Competent Person:

The term “competent person” is used in many OSHA standards. The definition of a competent person, by OSHA standards, is one who “is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them”. (29 CFR 1926.32(f)). While there are specific standards which require a specially trained individual designated to oversee a specific work practice as a “competent person”, all employees must be trained in hazard recognition techniques and all have the authority to stop work in the event of a hazardous situation.

The activities which a designated and DOCUMENTED competent person according to OSHA standards will be assigned are as follows:

·

SITE SPECIFIC SAFETY PLAN

Project Name and Number

HEALTH AND SAFETY

Page 7 of 20

Responsible Person

Additionally, assigned “responsible” persons will be assigned for the following activities: 1.

These “Responsible Persons” will have documentation that they possess the training, knowledge, skills and abilities to perform the assigned functions.

Scope of Work:

Logical Sequence of Task:

1.

SITE SPECIFIC SAFETY PLAN

Project Name and Number

HEALTH AND SAFETY

Page 10 of 20

SPECIFIC SITE SAFETY RULES:

1.

Schedule:

Proposed Start Date:

Duration:

Working Hours:

Overtime Hours:

Access to Work Area:

SITE SPECIFIC SAFETY PLAN

Project Name and Number

HEALTH AND SAFETY

Resources Required to Undertake Works:

Contractor, Equipment, Materials:

Inspections / Documentation Required:

· .

Personal Protective Equipment (PPE):

All employees and subcontractor employees will use and wear approved PPE as follows :

·

Disposal of contaminated PPE

First Aid, Emergency and Treatment Arrangements:

1.

Medical Facilities Identified for this Project:

Occupational Clinic Name:

Address:

Telephone:

Working Hours:

~ Map~

Emergency Medical Facilities Identified for this Project:

Emergency Hospital Name:

Address:

Telephone:

Working Hours:

~Map~

Monitoring & Compliance

Monitoring and compliance of the work by ———

*** Include Emergency Action Procedures and Site Map

Subject

Required

Specific & detailed information / description required for all questions.

List OSHA Standard Number

Yes

No

Compressed Gas:

N/A

Will cylinders be brought on site?

Are there plans for safe use and storage on site?

Will portable torch sets be required?

(All gas cylinders and welding machines must be left outside of excavations and

long enough leads provided.)

<tr

Our website has a team of professional writers who can help you write any of your homework. They will write your papers from scratch. We also have a team of editors just to make sure all papers are of HIGH QUALITY & PLAGIARISM FREE. To make an Order you only need to click Ask A Question and we will direct you to our Order Page at WriteEdu. Then fill Our Order Form with all your assignment instructions. Select your deadline and pay for your paper. You will get it few hours before your set deadline.

Fill in all the assignment paper details that are required in the order form with the standard information being the page count, deadline, academic level and type of paper. It is advisable to have this information at hand so that you can quickly fill in the necessary information needed in the form for the essay writer to be immediately assigned to your writing project. Make payment for the custom essay order to enable us to assign a suitable writer to your order. Payments are made through Paypal on a secured billing page. Finally, sit back and relax.

Do you need an answer to this or any other questions?

Do you need help with this question?

Get assignment help from WriteEdu.com Paper Writing Website and forget about your problems.

WriteEdu provides custom & cheap essay writing 100% original, plagiarism free essays, assignments & dissertations.

With an exceptional team of professional academic experts in a wide range of subjects, we can guarantee you an unrivaled quality of custom-written papers.

Chat with us today! We are always waiting to answer all your questions.

Click here to Place your Order Now



Subject

Required

Specific & detailed information / description required for all

questions. List OSHA Standard Number

Yes

No

Ladders:

N/A

Will ladders be required?

(All ladders – min 300 lb. rating.)

The ladder chosen must be long enough to provide access to the work area without necessitating standing

on the top two steps of a stepladder

or the top three rungs of a straight ladder.